Compliant Computer Systems Reassurance
Our pledge is a 10-point CCS Certified Inspection
Our Quality Pledge
10-point CCS Certified Inspection
- Audit and inspection – Hardware is inspected when it arrives to confirm the part number, revision level, and cosmetic condition.
- Initial Testing – Full test and boot up using the OEM’s recommended diagnostics steps.
- Integration testing – Our engineers replace any non-working parts and upgrade the system to the current revision levels.
- Inbound Full Test – Full diagnostics testing with all integrated parts fully configured to confirm all parts are compatible with one another.
- Inventor steps – All major components and the chassis are identified by the manufacturer’s part number and serial number and stored in a climate-controlled warehouse facility.
- Outgoing inspection – all parts are inspected on the way out to confirm no additional damage during storage.
- Configuration – All orders are custom configured to the specifications requested by the customer.
- Outgoing Full Test – Full diagnostic test of customer requested configuration.
- Quality Check – All orders are rechecked for completeness to make sure all orders match the customer’s PO.
- Pack and Ship – All orders are professionally packed to insure against damage and all shipping arrange to ship on the service requested by the customer’s PO.